Fan balancing – Mission accomplished!

    bg-separatore
    Fan balancing – Mission accomplished!

    Once again on site for a critical balancing service following an urgent request on a UK paper production facility. Our technicians intervened quickly to analyze the problem and carry out the balancing of the fan impeller.

    The vibration measurements detected on the main air recirculation fan indicated a vibration of 30 mm / s @ 1X which was transmitted to the fan structure and to the other adjacent rotating machines.

    Following the inspection of the fan impeller, a balancing procedure was carried out which allowed the rotating machine to be restarted with vibrations below the alarm thresholds: 1.4 mm / s @ 1X.

    See also

    Lubricant Expo and The Bearing Show – Hall 9 at Messe Düsseldorf, Germany Lubricant Expo is Europe’s largest exhibition and conference, connecting lubricant solution providers with the […]

    ISE Gold Sponsor at EuroMaintenance24 Where : Rimini – Palacongressi When : 16-17-18 September 2024 ISE BOOTH 8 and 9   Speakers at the Conference  Tuesday […]

    Flow Induced Vibration Experiment in Fuel Pin Bundle with Heavy Liquid-Metal Flow: Test Section Design and Measurement Methods Simone Mozzon, Research & Applications Specialist and Marco […]

    GDPR Cookie Consent with Real Cookie Banner

      This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

       I have read the privacy*

      * Required fields